Another attempt at updates. Peter put together a lovely timeline of what we've done and when. As I find the photos and make individual posts, I will attempt to do it in chronological order.
July 2010 - Installed new 200 amp electrical service
Aug 2010 - Installed ceiling light in second floor master bedroom
Aug - Sept 2010 - Repaired slate roof. New copper ridge and flashings. Repaired fascia and
replacement aluminum trim.
Sept - Oct 2010 - Deconstruction of summer kitchen/carriage shed
Oct 2010 - Installed Insulation in Second Floor Living Room
Jan 2011 - Removed old boiler and converted first floor heating to new boiler
Feb 2011 - Installed chimney liner & Vermont Castings wood stove on second floor
Feb 2011 - July 2012 Renovated Second floor rear bedroom, refinished floor and walls, built closet,
installed new electrical wiring, switch & light fixture
Jan 2012 - Restored antique doorbell on front door
Aug 2012 - Installed crown molding in second floor master bedroom
Oct 2010 - May 2014 - Replacement of 36 windows, new trim installed around windows
Feb 2014 - removed old first floor kitchen flooring
Mar - Apr 2014 - Removed old first floor kitchen ceiling tiles, plaster, and lath board
Mar - May 2014 - Lead Paint Abatement. 1st floor hall sanded, 2nd floor hall and master bedroom
sanded, interior doors removed & stripped, front porch columns & trim scraped
Jun 2014 - Installed new plumbing between basement and second floor
Jul 2014 - Repainted master bedroom and sealed sanded floors in bedroom and halls
Nov 2014 - Installed insulation in first floor kitchen & pantry ceilings
Dec 2014 - Jan 2015 - Repairs to first floor kitchen & pantry. Repaired rotten beam, sub-flooring,
flooring, and wall. Installed new electrical wiring and switches in hall,
kitchen pantry. Removed metal door and rehung original wooden kitchen door.
Jan - Feb 2015 - Demo of 1st floor bathroom, insulated ceiling, new electrical and drywall installed
Mar 2015 - Removed 1st floor dining room ceiling plaster & lath board, installed new wiring, switch,
& light
Apr 2015 - Installed Outdoor shower enclosure and plumbing, replaced roof of bulkhead
Apr - May 2015 - Additional Lead Paint Abatement. Stripped wood trim, pantry shelves, fireplace mantels. New Plaster ceilings in kitchen, dining room, and pantry.
June 2015 - Repainted front door and replaced glass
Oct 2015 - Jan 2016 - Rebuilt front porch. Dig & install 6 footings, new framing, new deck, added
two custom turned porch columns for support, installed new electrical wiring
& porch lights, new ceiling, new roof & flashing, stairs and railings.
May - Jul 2016 - Installed copper gutter & downspout on front porch.
Subscribe to:
Post Comments (Atom)
I am so impressed, you've gotten so much done in just a few years. Good job, you two!!! I'm curious about which jobs you've tackled yourselves and what you've hired people to do, and what's next on the docket? I love reading about your progress!
ReplyDeleteWork we hired out for was: the electrical upgrade, slate roof repair, the really big beams from the summer kitchen, chimney liner, lead abatement, and the porch rebuild. Next up: we ordered a custom screen door which we'll hopefully be getting and hanging soon and we just found a mason. All the masonry work will probably get it's own post. The final touches on the porch are happening right now, and then I'll post photos.
ReplyDelete