Sunday, July 17, 2016

A timeline of events

Dude it's hard keeping up with kids, a farm, a house, and blogs.
Here we go.
Another attempt at updates.   Peter put together a lovely timeline of what we've done and when.  As I find the photos and make individual posts, I will attempt to do it in chronological order.

July 2010 - Installed new 200 amp electrical service

Aug 2010 - Installed ceiling light in second floor master bedroom

Aug - Sept 2010 - Repaired slate roof.  New copper ridge and flashings. Repaired fascia and
                              replacement aluminum trim.

Sept - Oct 2010 - Deconstruction of summer kitchen/carriage shed

Oct 2010 - Installed Insulation in Second Floor Living Room

Jan 2011 - Removed old boiler and converted first floor heating to new boiler

Feb 2011 - Installed chimney liner & Vermont Castings wood stove on second floor

Feb 2011 - July 2012 Renovated Second floor rear bedroom, refinished floor and walls, built closet,
                  installed new electrical wiring, switch & light fixture

Jan 2012 - Restored antique doorbell  on front door

Aug 2012 - Installed crown molding in second floor master bedroom

Oct 2010 - May 2014 - Replacement of 36 windows, new trim installed around windows

Feb 2014 - removed old first floor kitchen flooring

Mar - Apr 2014 - Removed old first floor kitchen ceiling tiles, plaster, and lath board

Mar - May 2014 - Lead Paint Abatement.  1st floor hall sanded, 2nd floor hall and master bedroom        
                              sanded, interior doors removed & stripped, front porch columns & trim scraped

Jun 2014 - Installed new plumbing between basement and second floor

Jul 2014 - Repainted master bedroom and sealed sanded floors in bedroom and halls

Nov 2014 - Installed insulation in first floor kitchen & pantry ceilings

Dec 2014 - Jan 2015 - Repairs to first floor kitchen & pantry.  Repaired rotten beam, sub-flooring,
                                    flooring, and wall.  Installed new electrical wiring and switches in hall,
                                    kitchen pantry.  Removed metal door and rehung original wooden kitchen door.

Jan - Feb 2015 - Demo of 1st floor bathroom, insulated ceiling, new electrical and drywall installed

Mar 2015 - Removed 1st floor dining room ceiling plaster & lath board, installed new wiring, switch,
                   & light

Apr 2015 - Installed Outdoor shower enclosure and plumbing, replaced roof of bulkhead

Apr - May 2015 - Additional Lead Paint Abatement.  Stripped wood trim, pantry shelves, fireplace mantels. New Plaster ceilings in kitchen, dining room, and pantry.

June 2015 - Repainted front door and replaced glass

Oct 2015 - Jan 2016 - Rebuilt front porch.  Dig & install 6 footings, new framing, new deck, added
                                    two custom turned porch columns for support, installed new electrical wiring                
                                    &  porch lights, new ceiling, new roof & flashing, stairs and railings.

May - Jul 2016 - Installed copper gutter & downspout on front porch.